Annual updates to the Master Fee Schedule were adopted by the City Council (Resolution No 23-082) on April 18, 2023, and will become effective on July 1, 2023. Fee schedules below show both the current fee (thru June 30, 2023) and the new fee (effective 7/1/23). Fees are applied based on the application date of the permit. Please refer the the applicable column based on effective date.
Building Misc, Electrical, Plumbing Mechanical Permit Fees
Residential Fee Table (Single Family/Duplex/Additional Dwelling unit)
Building Permit Fee Type Square Footage Methodology - All others, based on occupancy type
Current Development Impact (AB 1600) Fees including Exhibit A, Dixon Storm Drainage Basin Fee Areas Map (PDF). These fees were adopted as part of the annual update approved by the City Council (Resolution No. 23-002), on January 3, 2023. They become effective as of March 6, 2023. Projects that have already summited a complete permit application, would be subject to the AB 1600 fees in place at the time of their submittal and can be found here
Dixon Building Permit Application (PDF)
Dixon Building Permit Application (Fillable PDF)
Building Permit Revision Form
Building Permit Extension Request
Accessibility Complaint Form (PDF)
Accessibility Checklist-Hardship Request
Air District Questionnaire (PDF)
Building Inspection Information
Construction and Demolition Packet (PDF)
Dixon School District Impact Fee Form
Electric Vehicle Service Equipment (EVSE) Checklist
Owner-Builder Form/Alarms and Water Saving Fixtures (PDF)
Residential Service Load Worksheet
Special Inspection Agreement Dixon
Submittal Checklist - Non Residential Plan Review (PDF) **Coming Soon
Submittal Checklist - Residential Plan Review (PDF)
Swimming Pool Declaration Form (PDF)
Water Meter Purchase Schedule for City of Dixon water only (updated 3/1/22 by City Council Resolution 22-039)
Water Meter Requisition Form (for City of Dixon Water only)
Digital Billboard Use Policy (PDF)
Residential Housing Allotment Application - Measure B (PDF)